Binnall House — HUD inspection scores

HUD-assisted multifamily · 125 Connors St, Gardner, MA 01440

Latest published score NSPIRE
97 Passing
out of 100 Inspected January 9, 2024

Scores higher than 74% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 24, 2002 — scored 91.62 (REAC (UPCS)) September 30, 2005 — scored 84.86 (REAC (UPCS)) July 26, 2007 — scored 72.29 (REAC (UPCS)) July 25, 2008 — scored 95.97 (REAC (UPCS)) October 2, 2014 — scored 92 (REAC (UPCS)) December 18, 2018 — scored 81c (REAC (UPCS)) November 22, 2021 — scored 86c (REAC (UPCS)) January 9, 2024 — scored 97 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
January 9, 2024 97 NSPIRE
November 22, 2021 86c REAC (UPCS)
December 18, 2018 81c REAC (UPCS)
October 2, 2014 92 REAC (UPCS)
July 25, 2008 95.97 REAC (UPCS)
July 26, 2007 72.29 REAC (UPCS)
September 30, 2005 84.86 REAC (UPCS)
September 24, 2002 91.62 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.