Braintree Village Apartments — HUD inspection scores

HUD-assisted multifamily · 2 Mccusker Dr, Braintree, MA 02184

Latest published score REAC (UPCS)
90b Passing
out of 100 Inspected June 28, 2023

Scores higher than 27% of Massachusetts’s 1,293 currently scored properties · state median 94

This property's most recent published score is from the pre-2023 REAC regime. The letter and star are REAC's: the letter subdivides by deficiency profile, the star flags a health or safety deficiency.

100 80 60 0 2020 2021 2022 2023 April 23, 2019 — scored 78c (REAC (UPCS)) June 28, 2023 — scored 90b (REAC (UPCS))
Scores as published by HUD.
Inspection date Score Standard
June 28, 2023 90b REAC (UPCS)
April 23, 2019 78c REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.