Castle Cove — HUD inspection scores

HUD-assisted multifamily · 225 W 2nd St, South Boston, MA 02127

Latest published score NSPIRE
87 Passing
out of 100 Inspected March 7, 2025

Scores higher than 19% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 22, 2003 — scored 96.49 (REAC (UPCS)) December 20, 2006 — scored 69.88 (REAC (UPCS)) October 29, 2007 — scored 70.59 (REAC (UPCS)) February 23, 2009 — scored 88.39 (REAC (UPCS)) December 11, 2014 — scored 98b (REAC (UPCS)) March 22, 2018 — scored 87b (REAC (UPCS)) March 7, 2025 — scored 87 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
March 7, 2025 87 NSPIRE
March 22, 2018 87b REAC (UPCS)
December 11, 2014 98b REAC (UPCS)
February 23, 2009 88.39 REAC (UPCS)
October 29, 2007 70.59 REAC (UPCS)
December 20, 2006 69.88 REAC (UPCS)
July 22, 2003 96.49 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.