Cefalo Memorial Complex — HUD inspection scores

HUD-assisted multifamily · 245 W Wyoming Ave, Melrose, MA 02176

Latest published score NSPIRE
97 Passing
out of 100 Inspected March 15, 2024

Scores higher than 74% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 October 14, 2003 — scored 93.59 (REAC (UPCS)) August 3, 2007 — scored 94.78 (REAC (UPCS)) September 26, 2014 — scored 96b (REAC (UPCS)) July 19, 2018 — scored 87b (REAC (UPCS)) March 15, 2024 — scored 97 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
March 15, 2024 97 NSPIRE
July 19, 2018 87b REAC (UPCS)
September 26, 2014 96b REAC (UPCS)
August 3, 2007 94.78 REAC (UPCS)
October 14, 2003 93.59 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.