Cox Building — HUD inspection scores

HUD-assisted multifamily · 311 Dudley St, Roxbury, MA 02119

Latest published score NSPIRE
91 Passing
out of 100 Inspected July 30, 2025

Scores higher than 33% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 August 9, 2001 — scored 86.67 (REAC (UPCS)) August 19, 2003 — scored 43.44 (REAC (UPCS)) September 29, 2004 — scored 89.43 (REAC (UPCS)) August 16, 2007 — scored 87 (REAC (UPCS)) July 1, 2009 — scored 89.15 (REAC (UPCS)) October 16, 2014 — scored 80 (REAC (UPCS)) January 4, 2017 — scored 83 (REAC (UPCS)) May 16, 2019 — scored 73b (REAC (UPCS)) May 6, 2022 — scored 88b (REAC (UPCS)) · health or safety deficiency flagged July 30, 2025 — scored 91 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
July 30, 2025 91 NSPIRE
May 6, 2022 88b* REAC (UPCS)
May 16, 2019 73b REAC (UPCS)
January 4, 2017 83 REAC (UPCS)
October 16, 2014 80 REAC (UPCS)
July 1, 2009 89.15 REAC (UPCS)
August 16, 2007 87 REAC (UPCS)
September 29, 2004 89.43 REAC (UPCS)
August 19, 2003 43.44 REAC (UPCS)
August 9, 2001 86.67 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.