Cromwell Court — HUD inspection scores

HUD-assisted multifamily · 168 Barnstable Rd, Hyannis, MA 02601

Latest published score NSPIRE
84 Passing
out of 100 Inspected September 2, 2025

Scores higher than 12% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2000 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 December 1, 2000 — scored 87.87 (REAC (UPCS)) October 10, 2002 — scored 93.85 (REAC (UPCS)) September 18, 2006 — scored 91.04 (REAC (UPCS)) July 28, 2009 — scored 93.55 (REAC (UPCS)) November 8, 2013 — scored 90 (REAC (UPCS)) November 4, 2016 — scored 82 (REAC (UPCS)) November 15, 2018 — scored 89c (REAC (UPCS)) · health or safety deficiency flagged June 15, 2023 — scored 86c (REAC (UPCS)) September 2, 2025 — scored 84 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
September 2, 2025 84 NSPIRE
June 15, 2023 86c REAC (UPCS)
November 15, 2018 89c* REAC (UPCS)
November 4, 2016 82 REAC (UPCS)
November 8, 2013 90 REAC (UPCS)
July 28, 2009 93.55 REAC (UPCS)
September 18, 2006 91.04 REAC (UPCS)
October 10, 2002 93.85 REAC (UPCS)
December 1, 2000 87.87 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.