Edison Green Apartments — HUD inspection scores

HUD-assisted multifamily · 915 Dorchester Ave, Dorchester, MA 02125

Latest published score NSPIRE
99 Passing
out of 100 Inspected January 9, 2026

Scores higher than 90% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2000 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 8, 2000 — scored 87.2 (REAC (UPCS)) December 26, 2002 — scored 92.24 (REAC (UPCS)) December 7, 2005 — scored 63.86 (REAC (UPCS)) January 11, 2007 — scored 71.83 (REAC (UPCS)) March 4, 2008 — scored 94.18 (REAC (UPCS)) December 11, 2014 — scored 56 (REAC (UPCS)) December 4, 2015 — scored 98 (REAC (UPCS)) December 4, 2018 — scored 89 (REAC (UPCS)) November 19, 2021 — scored 49c (REAC (UPCS)) December 15, 2022 — scored 94b (REAC (UPCS)) January 9, 2026 — scored 99 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
January 9, 2026 99 NSPIRE
December 15, 2022 94b REAC (UPCS)
November 19, 2021 49c REAC (UPCS)
December 4, 2018 89 REAC (UPCS)
December 4, 2015 98 REAC (UPCS)
December 11, 2014 56 REAC (UPCS)
March 4, 2008 94.18 REAC (UPCS)
January 11, 2007 71.83 REAC (UPCS)
December 7, 2005 63.86 REAC (UPCS)
December 26, 2002 92.24 REAC (UPCS)
September 8, 2000 87.2 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.