Hellenic Seniors Center — HUD inspection scores

HUD-assisted multifamily · 7847 Rush River Dr, Sacramento, CA 95831

Latest published score NSPIRE
100 Passing
out of 100 Inspected April 30, 2025

Scores higher than 96% of California’s 2,325 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 29, 2002 — scored 85.42 (REAC (UPCS)) April 12, 2005 — scored 75.02 (REAC (UPCS)) March 2, 2007 — scored 54.34 (REAC (UPCS)) August 29, 2013 — scored 88 (REAC (UPCS)) August 25, 2015 — scored 89c (REAC (UPCS)) March 28, 2018 — scored 83b (REAC (UPCS)) April 30, 2025 — scored 100 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
April 30, 2025 100 NSPIRE
March 28, 2018 83b REAC (UPCS)
August 25, 2015 89c REAC (UPCS)
August 29, 2013 88 REAC (UPCS)
March 2, 2007 54.34 REAC (UPCS)
April 12, 2005 75.02 REAC (UPCS)
July 29, 2002 85.42 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.