Hotel Worthy — HUD inspection scores

HUD-assisted multifamily · 193 Worthington St, Springfield, MA 01103

Latest published score NSPIRE
96 Passing
out of 100 Inspected March 17, 2025

Scores higher than 65% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 9, 2003 — scored 97.1 (REAC (UPCS)) September 18, 2006 — scored 78.45 (REAC (UPCS)) August 27, 2007 — scored 66.57 (REAC (UPCS)) August 18, 2008 — scored 75.17 (REAC (UPCS)) July 30, 2013 — scored 80 (REAC (UPCS)) November 5, 2015 — scored 84 (REAC (UPCS)) May 17, 2018 — scored 71 (REAC (UPCS)) July 24, 2019 — scored 91c (REAC (UPCS)) February 6, 2023 — scored 81c (REAC (UPCS)) March 17, 2025 — scored 96 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
March 17, 2025 96 NSPIRE
February 6, 2023 81c REAC (UPCS)
July 24, 2019 91c REAC (UPCS)
May 17, 2018 71 REAC (UPCS)
November 5, 2015 84 REAC (UPCS)
July 30, 2013 80 REAC (UPCS)
August 18, 2008 75.17 REAC (UPCS)
August 27, 2007 66.57 REAC (UPCS)
September 18, 2006 78.45 REAC (UPCS)
July 9, 2003 97.1 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.