Logo Apartments — HUD inspection scores

HUD-assisted multifamily · 258 Warren St, Roxbury, MA 02119

Latest published score NSPIRE
97 Passing
out of 100 Inspected September 30, 2024

Scores higher than 74% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 5, 2002 — scored 68.17 (REAC (UPCS)) September 29, 2003 — scored 79.29 (REAC (UPCS)) September 21, 2004 — scored 74.99 (REAC (UPCS)) August 1, 2006 — scored 57.49 (REAC (UPCS)) October 9, 2007 — scored 96.37 (REAC (UPCS)) August 21, 2014 — scored 78 (REAC (UPCS)) September 22, 2015 — scored 92 (REAC (UPCS)) March 26, 2019 — scored 75 (REAC (UPCS)) November 9, 2021 — scored 58b (REAC (UPCS)) December 23, 2022 — scored 72c (REAC (UPCS)) September 30, 2024 — scored 97 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
September 30, 2024 97 NSPIRE
December 23, 2022 72c REAC (UPCS)
November 9, 2021 58b REAC (UPCS)
March 26, 2019 75 REAC (UPCS)
September 22, 2015 92 REAC (UPCS)
August 21, 2014 78 REAC (UPCS)
October 9, 2007 96.37 REAC (UPCS)
August 1, 2006 57.49 REAC (UPCS)
September 21, 2004 74.99 REAC (UPCS)
September 29, 2003 79.29 REAC (UPCS)
July 5, 2002 68.17 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.