Marla Manor — HUD inspection scores

HUD-assisted multifamily · 644 Se 148th Ave, Portland, OR 97233

Latest published score NSPIRE
81 Passing
out of 100 Inspected November 21, 2024

Scores higher than 27% of Oregon’s 474 currently scored properties · state median 88

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 16, 2001 — scored 93.29 (REAC (UPCS)) June 3, 2005 — scored 90.16 (REAC (UPCS)) May 15, 2008 — scored 82 (REAC (UPCS)) August 26, 2015 — scored 84 (REAC (UPCS)) March 19, 2018 — scored 64 (REAC (UPCS)) July 26, 2019 — scored 89 (REAC (UPCS)) August 17, 2021 — scored 87c (REAC (UPCS)) · health or safety deficiency flagged November 21, 2024 — scored 81 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
November 21, 2024 81 NSPIRE
August 17, 2021 87c* REAC (UPCS)
July 26, 2019 89 REAC (UPCS)
March 19, 2018 64 REAC (UPCS)
August 26, 2015 84 REAC (UPCS)
May 15, 2008 82 REAC (UPCS)
June 3, 2005 90.16 REAC (UPCS)
July 16, 2001 93.29 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.