Maverick Landing Phase II — HUD inspection scores

Public housing · 119 Sumner St, East Boston, MA 02128

Latest published score NSPIRE
70 Watch
out of 100 Inspected April 16, 2025

Scores higher than 2% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 March 17, 2009 — scored 97.43 (REAC (UPCS)) June 19, 2014 — scored 92 (REAC (UPCS)) May 10, 2017 — scored 92 (REAC (UPCS)) April 16, 2025 — scored 70 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
April 16, 2025 70 NSPIRE
May 10, 2017 92 REAC (UPCS)
June 19, 2014 92 REAC (UPCS)
March 17, 2009 97.43 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.