Memorial Square I — HUD inspection scores

HUD-assisted multifamily · 2295 Main Streert, Springfield, MA 01107

Latest published score REAC (UPCS)
94b Passing
out of 100 Inspected February 22, 2018

Scores higher than 49% of Massachusetts’s 1,293 currently scored properties · state median 94

This property's most recent published score is from the pre-2023 REAC regime. The letter and star are REAC's: the letter subdivides by deficiency profile, the star flags a health or safety deficiency.

100 80 60 0 2017 2018 2019 February 22, 2018 — scored 94b (REAC (UPCS))
Scores as published by HUD.
Inspection date Score Standard
February 22, 2018 94b REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.