Mishawum Park Apts — HUD inspection scores

HUD-assisted multifamily · 3 Dunstable St, Charlestown, MA 02129

Latest published score NSPIRE
90 Passing
out of 100 Inspected February 8, 2024

Scores higher than 27% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 April 25, 2001 — scored 96.36 (REAC (UPCS)) October 28, 2004 — scored 98.29 (REAC (UPCS)) December 28, 2007 — scored 87.79 (REAC (UPCS)) January 14, 2014 — scored 84 (REAC (UPCS)) January 15, 2014 — scored 84 (REAC (UPCS)) June 23, 2017 — scored 84c (REAC (UPCS)) · health or safety deficiency flagged September 23, 2019 — scored 81c (REAC (UPCS)) · health or safety deficiency flagged February 8, 2024 — scored 90 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
February 8, 2024 90 NSPIRE
September 23, 2019 81c* REAC (UPCS)
June 23, 2017 84c* REAC (UPCS)
January 15, 2014 84 REAC (UPCS)
January 14, 2014 84 REAC (UPCS)
December 28, 2007 87.79 REAC (UPCS)
October 28, 2004 98.29 REAC (UPCS)
April 25, 2001 96.36 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.