Skyview Downtown — HUD inspection scores

HUD-assisted multifamily · 10 Chestnut St, Springfield, MA 01103

Latest published score NSPIRE
95 Passing
out of 100 Inspected November 24, 2025

Scores higher than 57% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 July 24, 2003 — scored 76.66 (REAC (UPCS)) September 9, 2004 — scored 65.09 (REAC (UPCS)) July 21, 2006 — scored 54.75 (REAC (UPCS)) September 12, 2007 — scored 83.82 (REAC (UPCS)) August 24, 2009 — scored 60.32 (REAC (UPCS)) November 7, 2013 — scored 53 (REAC (UPCS)) July 23, 2015 — scored 63 (REAC (UPCS)) October 11, 2016 — scored 95c (REAC (UPCS)) · health or safety deficiency flagged July 8, 2021 — scored 96b (REAC (UPCS)) November 24, 2025 — scored 95 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
November 24, 2025 95 NSPIRE
July 8, 2021 96b REAC (UPCS)
October 11, 2016 95c* REAC (UPCS)
July 23, 2015 63 REAC (UPCS)
November 7, 2013 53 REAC (UPCS)
August 24, 2009 60.32 REAC (UPCS)
September 12, 2007 83.82 REAC (UPCS)
July 21, 2006 54.75 REAC (UPCS)
September 9, 2004 65.09 REAC (UPCS)
July 24, 2003 76.66 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.