South End Tenants Houses II — HUD inspection scores

HUD-assisted multifamily · 139 Pembroke St, Boston, MA 02118

Latest published score NSPIRE
82 Passing
out of 100 Inspected January 16, 2024

Scores higher than 10% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 April 23, 2001 — scored 94.99 (REAC (UPCS)) April 27, 2009 — scored 90.68 (REAC (UPCS)) July 16, 2015 — scored 96 (REAC (UPCS)) June 8, 2018 — scored 71 (REAC (UPCS)) August 13, 2019 — scored 73 (REAC (UPCS)) October 21, 2022 — scored 75c (REAC (UPCS)) January 16, 2024 — scored 82 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
January 16, 2024 82 NSPIRE
October 21, 2022 75c REAC (UPCS)
August 13, 2019 73 REAC (UPCS)
June 8, 2018 71 REAC (UPCS)
July 16, 2015 96 REAC (UPCS)
April 27, 2009 90.68 REAC (UPCS)
April 23, 2001 94.99 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.