Uphams Corner — HUD inspection scores

HUD-assisted multifamily · 3 Bird St, Boston, MA 02125

Latest published score NSPIRE
86 Passing
out of 100 Inspected January 23, 2025

Scores higher than 17% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2005 2010 2015 2020 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 September 23, 2003 — scored 66.86 (REAC (UPCS)) August 17, 2004 — scored 60.42 (REAC (UPCS)) July 20, 2006 — scored 75.71 (REAC (UPCS)) September 11, 2007 — scored 96.36 (REAC (UPCS)) September 25, 2013 — scored 90 (REAC (UPCS)) September 29, 2016 — scored 98a (REAC (UPCS)) August 13, 2021 — scored 87c (REAC (UPCS)) January 23, 2025 — scored 86 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
January 23, 2025 86 NSPIRE
August 13, 2021 87c REAC (UPCS)
September 29, 2016 98a REAC (UPCS)
September 25, 2013 90 REAC (UPCS)
September 11, 2007 96.36 REAC (UPCS)
July 20, 2006 75.71 REAC (UPCS)
August 17, 2004 60.42 REAC (UPCS)
September 23, 2003 66.86 REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.