Vermont Building — HUD inspection scores

HUD-assisted multifamily · 10 Thacher St, Boston, MA 02113

Latest published score NSPIRE
95 Passing
out of 100 Inspected November 18, 2024

Scores higher than 57% of Massachusetts’s 1,293 currently scored properties · state median 94

Under NSPIRE, a score below 60 is failing; 60–79 puts a property on a more frequent inspection cycle.

100 80 60 0 2023 2024 2025 HUD replaced REAC scoring with NSPIRE in 2023. Scores on either side of this line come from different standards and are not directly comparable. REAC → NSPIRE · 2023 June 27, 2023 — scored 69b (REAC (UPCS)) November 18, 2024 — scored 95 (NSPIRE)
Scores as published by HUD. NSPIRE (2023–) and REAC (2000–2023) scores come from different standards and are not directly comparable.
Inspection date Score Standard
November 18, 2024 95 NSPIRE
June 27, 2023 69b REAC (UPCS)

HUD's published files sample the record: each snapshot carries a property's latest score at publication, so an inspection can be missing between snapshots, and no inspections conducted 2010–2012 appear in any file HUD still publishes. History here is assembled from every file HUD offers.